• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Tuesday, January 13, 2026 | 215 reads | 0 comments | 0 shares

Loker Kalsel Port Engineer & Operation Terminal Foreman Adaro Logistics 2026

ADARO

Adaro is looking for qualified professionals to join our logistics team. We are powering up and seeking individuals who are ready to manage vessel reliability and transshipment operations in South Kalimantan.

 

Port Engineer

Job Description:

Manage and oversee all aspects of vessel maintenance, dry docking, and repair activities to ensure operational reliability and compliance with safety and regulatory standards.

Requirements:

  • Minimum bachelor's degree of Marine Engineering, Naval Architecture or Marine Certification (ATT III).
  • Minimum 3 years of experience in the same or related position in Shipping Industry, Shipyard Industry or other similar industries.
  • Familiar with ISM code implementation.
  • Familiar with floating crane is a plus.
  • Able to read and analyze technical drawing.
  • Good command in English both oral and written.
  • Willing to be placed in South Kalimantan.

 

Operation Terminal Foreman

Job Description:

To record all ship operational activities for transshipment projects starting from loading, shipping and unloading coal from and into barges in all operational areas.

Requirements:

  • Minimum diploma's degree of Port and Shipping Management.
  • Minimum 2 years of experience in the same or related position in Shipping Industry or other similar industries.
  • Understanding about port loading management, ship's documents & certificates.
  • Attention to details.
  • Accustomed to implementing work safety.
  • Willing to be placed in Taboneo, South Kalimantan.

 

Should you be interested, please apply through our official career website:

www.adarocareer.com

Apply on February 13th, 2026 at the latest

 

The recruitment process is completely free of charge; no fees will be collected at any stage.

Beware of recruitment scams using the company's name.

  • Di iklankan: 2026-01-13 17:26:59 - Standar Waktu Asia Tenggara
  • Berakhir: 2026-02-13 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00