• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, September 10, 2025 | 387 reads | 0 comments | 0 shares

Kesempatan Berkarir di PT Mitrabara Adiperdana Tbk

 

MITRABARA ADIPERDANA

WE ARE HIRING!

 

GEOLOGIST & GEOTECH ENGINEER

Responsibilities

  • Develop exploration plans, including drilling, sampling, and geological mapping. Design geotechnical monitoring programs for pits, waste disposal areas, and facility structures.
  • Oversee coal sampling and laboratory analysis procedures.
  • Supervise the implementation of geotechnical recommendations in the field.
  • Monitor updates to geological models in line with ongoing mining developments
  • Evaluate coal resource and reserve estimates.
  • Perform slope stability analyses and conduct back-analyses in cases of geotechnical failure.
  • Develop early warning systems for potential geohazards (e.g., landslides, pit water hazards).
  • Coordinate with contractors to optimize the use of geotechnical survey technologies such as inclinometers, drones, and radar.

Requirements

  • Bachelor's degree (S1) in Geology or Geotechnical Engineering.
  • At least 5 years of experience in mining geology or geotechnical roles.
  • Proficient in geological software (e.g., Surpac, Minescape) and geotechnical tools (e.g., Slide, Plaxis).
  • Capable of conducting geohazard risk analyses.
  • Have a POP certificate or recognition as a Competent Geologist/Geotechnical Professional.
  • Willing to be assigned to Loreh, Malinau, North Kalimantan.

 

MINE PLAN ENGINEER

Responsibilities

  • Develop short-term and long-term mine plans.
  • Prepare daily, weekly, and monthly mine designs in accordance with technical parameters and production targets.
  • Analyze geological and topographical data to support effective planning.
  • Evaluate pit designs and mining sequences; optimize disposal areas and haul roads.
  • Coordinate with operations, geotechnical, and pit control teams to ensure effective implementation of mine plans.
  • Prepare regular reports on mine planning and production progress.
  • Utilize mining software to create mine designs and simulations.

Requirements

  • Minimum Bachelor's degree in Mining Engineering or Geology.
  • At least 5 years of experience in a similar role within the coal mining contractor industry.
  • Proficient in mining software such as Minescape, Surpac, AutoCAD, and other relevant tools.
  • Experienced in developing both short-term and long-term mine plans.
  • Skilled in designing mining infrastructure, including disposal areas, haul roads, and pit limits.
  • Strong analytical skills, attention to detail, and effective communication abilities.
  • Physically and mentally fit, and not color blind.
  • Have a POP (First Operational Supervisor) certificate is an advantage.
  • Willing to be assigned to Loreh, Malinau, North Kalimantan.

 

Submit your updated CV to:

recruitment_mbap@baramultigroup.co.id

mitrabaraadiperdana.co.id

  • Di iklankan: 2025-09-10 20:00:37 - Standar Waktu Asia Tenggara
  • Berakhir: 2025-09-24 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00