• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, August 20, 2025 | 129 reads | 0 comments | 0 shares

Lowongan Kerja sebagai Mine Operation Engineer di PT Multi Tambangjaya Utama

WE ARE HIRING

PT Multi Tambangjaya Utama subsidiaries of PT. Petrindo Jaya Kreasi, Tbk is hiring for

 

Mine Operation Engineer

JOB DESCRIPTIONS:

  • Supervise mining operations on a shiftly basis;
  • Supervise OB removal, topsoil removal, coal getting and coal hauling activities;
  • Control OB and coal production according to the target, including the quality of coal getting Control the performance of contractor units (PA & UA diggers, haulers and support units) according the JSO plan;
  • Create daily, weekly, and monthly data reports for internal and external purposes;

REQUIREVENT:

  • Candidate must possess at least Bachelor's Degree in Mining /Geology Engineering;
  • At least 2 Year(s) inrelated position, working experience frommining owner is preferred
  • Able to operate mining software and have KJL II certificate is advantage;
  • Have a POP certificate;
  • Good problem solving and strategic thinking,
  • Willing to be placed in site (Central Kalimantan)

 

Send your resume to email [email protected] & [email protected] within subject (Position_your name)

We never ask for any payment during recruitment process. So, please be safe for your job hunting!

  • Di iklankan: 2025-08-20 21:09:24 - Standar Waktu Asia Tenggara
  • Berakhir: 2025-09-03 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2020
Daerah Sektor Nominal (Rp.)
KALTIM UMUM 2.981.378,72
BALIKPAPAN UMUM 3.069.315,66
BERAU UMUM 3.386.593,23
BONTANG UMUM 3.182.706,00
KUBAR UMUM 3.309.555,00
KUKAR UMUM 3.179.673,00
KUTIM UMUM 3.140.098,00
PASER UMUM 3.025.172,00
PPU UMUM 3.363.809,79
SAMARINDA UMUM 3.112.156,40