• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Tuesday, August 05, 2025 | 331 reads | 0 comments | 0 shares

Lowongan Kerja Balikpapan di PT Indocool Solusi Cemerlang

DRAFTER

BALIKPAPAN PLACEMENT

DUTIES & RESPONSIBILITIES

  • Create/design 2D and/or 3D drawings related to customer request needs
  • Create Bill of Materials containing information about material requirements and quantities needed in one product.
  • Read, translate, and take measurements in the field if necessary.
  • Work together and communicate effectively with the sales team and project team to provide technical support.

REQUIREMENT

  • Min. Vocational High School/D3 majoring in Mechanical Drawing Engineering
  • Have Min. 1 year experience in the same field
  • Have the ability to create, read/translate engineering drawings
  • Have the ability to use drawing applications (AutoCAD, Solidwork)
  • Able to operate Ms Office (Word, Excel, Power Point)

 

 

MAINTENANCE STAFF

BALIKPAPAN PLACEMENT

DUTIES & RESPONSIBILITIES

  • Perform routine maintenance on machines, electrical systems, and building facilities
  • Identify and repair machine issues or malfunctions
  • Coordinate with other departments to schedule maintenance without disrupting
  • Inspect and replace worn or damage spare parts
  • Ensure all safety equipment is functioning properly
  • Record all maintenance and repair activities performed on machines
  • Follow safety guidelines and standard operating procedures (SOPs)

REQUIREMENT

  • Minimum Bachelor degree in Mechanichal Engineering, Electrical Engineering
  • Able to read and create electrical diagrams
  • Min. 2 years experience in similiar position
  • Knowledgeable in maintenance & services equipment
  • Understanding of electrical, hydraulic and other systems
  • Able to operate electrical equipment

 

Interested candidates can apply by sending their CV to : recruitment@indocool.co.id

  • Di iklankan: 2025-08-05 12:17:46 - Standar Waktu Asia Tenggara
  • Berakhir: 2025-08-19 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00