• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, May 21, 2025 | 579 reads | 0 comments | 0 shares

Lowongan Kerja sebagai Supervisor Warehouse (Mining /Spare Parts)

BERKARIR BERSAMA KAMI PT MEGA GLOBAL ENERGY

PT Mega Global Energy 100% is a subsidiary of LX International in South Korea Coal mining company located at East Kutai is now looking for:

 

Supervisor Warehouse (Mining /Spare Parts)

LOGISTIC DEPARTEMENT

Requirements:

  • Bachelor (S1) Engineering, Economics, or Finance
  • Minimum 5 years as Warehouse Supervisor in the mining sector or heavy equipment spare parts warehouse.
  • Accustomed to handling logistics and storage of heavy equipment components, machine parts, and mining project materials.
  • Technical Skills Microsoft Office (especially Excel)
  • Able to create stock opname reports, inventory aging, and spare parts needs. SAP / Odoo
  • Proficient in using ERP for stock management, purchasing requests (PR), and monitoring goods movement.
  • Experienced in goods receipt, stock transfer, issuance to field, and stocktaking processes.
  • Understand spare parts codes, lead times, and grouping based on critical levels.
  • Leadership Skills: Have strong leadership, able to manage warehouse teams, forklift operators, and Store Keepers
  • Accustomed to coordinating with maintenance, procurement, and operational teams on site

 

berkas lamaran juga bisa dikirim melalui email: hrdptmegaglobalenergy@gmail.com dengan format subject email - kode posisi - nama - kab/kota domisili Example: LogisticSPV - Jaya - Samarinda

Head Office: Pacific Century Place Floor 33, JI.Kebayoran Baru Jakarta Selatan, Indonesia 12190 Kutai Office: RT.01 Desa Bumi Etam Jl.Pelabuhan No.32 Kec. Kaubun, Kutai Timur, Kalimantan Timur 75684

  • Di iklankan: 2025-05-21 21:04:52 - Standar Waktu Asia Tenggara
  • Berakhir: 2025-06-04 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00