• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, April 20, 2022 | 851 reads | 0 comments | 0 shares

Field ICSS Engineer Refinery

We have a Great Opportunity for you to Explore. Will you be keen?

 

Job Title: Field ICSS Engineer Refinery

Balikpapan, 12 months No rotation

  • At least a Bachelor of Science degree in Instrument/Control Engineering
  • 7 (seven) years’ experience oil and gas and petrochemical project (i.e. refinery project, petrochemical, and gas processing/ LNG).
  • Has a wide range of experience in the Instrument/Control engineering with specific in design and planning for Instrument/Control especially for RFCC, hydrotreating, reforming, and hydrocracking plant include Integrated Control and Safety System (ICSS) and Emergency Shutdown System (ESD)
  • Has experience to develop Instrument/Control design basis, conceptual design of Instrument/Control and standard drawings and controlled all the Instrument/Control design activities through the project execution.
  • Has Experience in Major Instrument/Control system design.
  • Has Experience as Lead Instrument/Control Engineer
  • Has an excellent knowledge of current internationally recognized Codes and Standards such as API, ANSI, ISA, IEC, NEMA, NFPA, NEC, NFPA 70, IEEE, and ICEA.
  • It has been the principal engineer responsible for the design, analysis and review for Instrument/Control systems. in gas processing plants and utility facilities
  • Has a proven ability to perform Instrument/Control engineering include study, calculation in Instrument/Control System with a high level of quality.
  • Working knowledge in the use of computer programs (latest instrument/control engineering software) applicable to such designs
  • Had maintained effective relationship with COMPANY and CONTRACTOR and good coordination work to completed engineering activities in accordance with schedule requirements.
  • Has a good medical record
  • Fluent in Communication and writing in English



Send your CV (.doc/.docx) to email: resume-id@brunel.net
Put the “Job Title” as the subject email.
Also, advise

  1. Join date?
  2. Expected salary?
  3. Location?

Candidates who pass the screening will be contacted by the assigned recruiter.

  • Di iklankan: 2022-04-20 14:33:34 - Standar Waktu Asia Tenggara
  • Berakhir: 2022-05-04 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00