• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Friday, April 15, 2022 | 576 reads | 0 comments | 0 shares

PT Bharinto Ekatama (ITM subsidiaries)

PT Bharinto Ekatama (ITM subsidiaries) is looking for potential candidate to joint our team

 

PIT SERVICE

Job Responsibilities

  • Supervise construction works (Levee bank, drainage system, road etc.) 
  • Supervise topsoil and Overburden removal activity
  • Control & monitor the work of contractors
  • Ensure that the contractors work complies with procedure and rules/policy
  • Set up heavy equipment works plan
  • Reporting and = analytic contractor performance

Requirements:

  • Bachelor's degree Civil Engineering/ Mining Engineering
  • Experience working at a mining company with at least 2 years is required
  • Have Strong analytical, communication skill and problem solving
  • Good in English (writing and verbal)
  • Familiar with Ms Office, AutoCAD
  • Willing to works in team
  • Working location Melak Site - Kalimantan Timur

 

Environment Operation

Job Responsibilities

  • Ensure the data and information on environmental condition area presented in compliance with government environmental policy
  • Analyze of the Environment Impact
  • Assessment (Analisa dampak Lingkungan / AMDAL)
  • Provide report with documentation of environmental condition and quality (Online and Offline Report)
  • Have knowledge and experience in the field of environmental assessment (PROPERDA, PROPERNAS, ESDM)
  • Understanding what waste management (limbah B3), Acid Mine Water, Biodiversity and RKAB

Requirements:

  • Bachelor degree Environment Engineer/Forestry
  • Experience working at a mining company with at least 3 years is required
  • Understanding what government regulation and policy of the environmental
  • Have experience work with government
  • Have experience with field work and reporting
  • Have experience supervise and coordination with contractor
  • Good in English (writing and verbal)
  • Good Computer literate Ms. Office, Corel and Adobe Photoshop
  • Working location Melak Site - Kalimantan Timur

 

DAS Management

Job Responsibilities 

  • Work and coordination with government to select the location of planting for DAS Rehabilitation
  • Prepare technical design DAS
  • Rehabilitation, nursery, and _ planting
  • maintenance for the first and second years
  • Reporting about progress activities DAS contractor
  • Supervise and Reporting progress activities rehabilitation, nursery, and planting to superior and Government
  • Assistance in the process of evaluating the success of planting and handing over to the government

Requirements:

  • Bachelor's degree Forestry/Agriculture
  • Experience working at Mining company/PPKH/KPH DAS Rehabilitation with at least 3 years is required
  • Have experience to work survey with drone
  • Have Strong analytical, communication skill and problem solving
  • Good in English (writing and verbal)
  • Familiar with Ms Office, ArcGIS, AutoCad
  • Willing to works in team
  • Working location Melak Site Kalimantan Timur

 

 

Pit Scheduling

Job Responsibilities

  • Provide three month rolling plan for pit scheduling production, mass balance, ob + coal distance.
  • Mining reconciliation report for pit. and dump design (overcut, overdig)
  • Mining recovery report (model  vs survey vs truck scale) 
  • Provide annual + quarterly plan design (pit and dump design)

Requirements:

  • Bachelor degree Mining Engineering, Geology Engineering and Civil Engineering
  • Experience working at a mining company with at least 3 years is required
  • Good in English language
  • Have a good communication and problem solving
  • Familiar with Ms. Office, mining software {minescape, autoCAD, arcGIS, XPAC, SPRY, SDCS and minex)
  • Working location Melak Site - Kalimantan Timur

 

Send your resume & recent photograph to :
recruitment_melaksite@banpuindo.co.id

  • Di iklankan: 2022-04-15 18:59:11 - Standar Waktu Asia Tenggara
  • Berakhir: 2022-04-29 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00