• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Friday, March 18, 2022 | 1462 reads | 0 comments | 0 shares

PT KTC Coal Mining and Energy

PT KTC Coal Mining and Energy, has a challenging opportunity for highly motivated, qualified & dedicated individuals to join for the several positions :

 

  1. Project Manager

    • Minimum 10 years’ experience, though, & high leadership.
    • Operation, engineering, infrastructure, exploration, budgeting, data analyst, safety, site management, communications & managing people.
  2. (Senior) Mine Plan Engineer

    • Minimum 8 years’ experience
    • Short to long term plan, operation control/optimization, project scheduling, infrastructure development, budgeting & data analyst.
  3. Drill and Blast Engineer

    • Blast design, blast control & data analyst.
  4. Coal Geologist

    • Minimum 8 years’ experience
    • Exploration drilling, drilling plan, coal modelling, resources/reserve analysis & data analyst.
  5. Pit Geos Engineer

    • Coal model reconciliation, in pit progress control, in pit coal quality control, Geotech assessment, blast monitoring, in pit access assessment & data analyst.
  6. (Mining Operation) Data Analyst

    • Database management, analysis tools, software mastering, strong in math & high logic thinking.
  7. Explosive Warehouse Supervisor

    • Blast design, blast control, explosives consumptions analysis, blast permits, blast reporting, external coordination, explosive warehouse development & data analyst.
  8. Senior Accounting Supervisor (Samarinda)

    • Accounting, taxation, financial management, invoice control, advance & settlement control, purchase control, procurement control, inventory control & software mastering.
  9. Operation Supervisor/Foreman

    • Overburden removal, disposal management, road & pit infrastructure development, coal getting control, haul distance optimization, productivity control & improvement, equipment operations mastering, & managing people.
  10. HR Supervisor

    • Industrial relations, regulations & policies, recruitment strategy, people development strategy, performance analysis, database management, compensation & benefit policy, agreement preparation & policy, discipline strategy & policy, reporting, external relations support, & data analyst.
  11. GA Supervisor/Foreman

    • Site facility management, site services management, civil works & utilities development, transport management, pandemic control, canteen control, reporting, database, administration, & data analyst.
  12. (QC) Coal Analyst

    • Analytical methods, mastering to operate laboratory equipment & tools, coal quality & specifications control, coal getting method, stockpile control & management, barging/shipment control & data analyst.
  13. (CCP) Conveyorman

    • Conveyor maintain & repair, conveyor reliability control, barging/shipment control & data analyst.

 

Should you meet those criteria, send your comprehensive CV before 31st March, 2022, to :career_indo@ktcgroup.com.sg

  • Di iklankan: 2022-03-18 22:29:35 - Standar Waktu Asia Tenggara
  • Berakhir: 2022-04-01 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00