• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, July 28, 2021 | 1284 reads | 0 comments | 0 shares

PT BUMA Management Development Program (BMDP 36)

We are looking for self driven and high initiatives individuals to join

 

BUMA Management Development Program (BMDP 36)

Requirements :
Bachelor Degrees or Master Degrees from :

  1. Accounting
  2. Management
  3. Law
  4. Mining Engineering
  5. Geological Engineering
  6. Geodesy Engineering
  7. Industrial Engineering
  8. Mechanical Engineering
  9. Civil Engineering
  10. Occupational Health & Safety

Special Requirements :

  1. Minimal GPA 3.00 (Bachelor Degree)
  2. Minimal GPA 3.25 (Master Degree)
  3. Single, Maximal 24 year old (Bachelor Degree)
  4. Single, Maximal 26 year old (Master Degree)
  5. Fluent in English
  6. Willing to be placed at all over BUMA’s area


If you meet these requirements, please register yourself before August 8, 2021.
If you don't get a call until August 31, 2021 at the latest, the screening process will be considered as void.

Click link below for registration :

https://buma-recruitment.typeform.com/to/yLOUpyKZ
or you can scan barcode on poster.

Your Excellent Future, Start Here!

  • Di iklankan: 2021-07-28 22:53:33 - Standar Waktu Asia Tenggara
  • Berakhir: 2021-08-08 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00