• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Friday, July 23, 2021 | 1398 reads | 0 comments | 0 shares

Lowongan Kerja PT Interport Mandiri Utama Balikpapan

PT Interport Mandiri Utama (subsidiary of Indika Energy, Tbk), currently open vacancy for :
 

Instrument and Control Supervisor

The position exists for Technician of Engineering and Maintenance for Fuel Terminal.  The roles will be comprised of execution, monitoring, and reporting of Terminal and jetty maintenance and small project within terminal operation.

Qualification

The person in charge of this position should have Related experienced, preferable familiar to operate with a liquid bulk Terminal, Petrochemical or Oil & Gas

The candidate should have:

  1. Min. Diploma or bachelor’s degrees in electrical, Instrument
  2. with 5 years’ experience in same field, preferably from Oil & Gas or Fuel Terminal
  3. Computer literate
  4. Fluent in English and Bahasa Indonesia
  5. Responsible and safety conscious. Having a good
  6. health condition to work (fit to work)
  7. Willing to work in Kariangau, Balikpapan.

 

Mechanichal Supervisor

The position exist for Supervision of Engineering and Maintenance for Fuel Terminal. The roles will be in relation with planning, organizing, execution, of Terminal and jetty

Qualification

The person in charge of this position should have related experienced, preferable familiar to operate with a liquid bulk terminal, Petrochemical or Oil & Gas

The candidate should have:

  1. Min. Diploma or Bachelor Degrees in engineering (Mechanical, Electronic/Electric, Industrial)
  2. Age between 21 – 40 years Min 3 – 6 years in similar M&R or project works.
  3. Ability to work under minimum supervision.
  4. Ability to read P&ID
  5. Computer literate and familiar with MS Applications and AutoCad.
  6. Fluent in English and Bahasa Indonesia and good command of English.
  7. Responsible and safety conscious.
  8. Having a good health condition to work (fit to work) and free of color blindness
  9. Willing to work in Kariangau, Balikpapan.

 
send your CV to reruitment@interport.co.id,with
subject Instrument and Control Supervisor)

  • Di iklankan: 2021-07-23 21:38:39 - Standar Waktu Asia Tenggara
  • Berakhir: 2021-08-06 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00