• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, December 23, 2020 | 1141 reads | 0 comments | 0 shares

GRADUATE MINING ENGINEER - Assignment : Kideco & Tabang Project, East Kalimantan.

WE ARE HIRING!

PT Petrosea Tok. ts a multi-disciplinary mining, infrastructure and ofl & gas services Company with a track record of achievement in Indonesia since 1972. We offer a competitive advantage through our ability to provide complete pit-to-port mining solutions. integrated engineering and construction capabilities as we as logistic support, whilst demonstrating absolute commitment to heatth, safety & environment, quality management, and business integrity.

In 2019, Petrosea was selected by the World Economic Forum as the only mining company and the only Indonesian owned company to join its Global Lighthouse Network. Petrosea was selected as one of only 10 companies is the world to successfully implement Industry 4.0 technologies to drive its financial end operational performance. As a lighthouse. Petrosea now serves to guide other companies to overcome challenges in applying Industry 4.0 technologies, such as artificial intelligence and big data analytics.

 

GRADUATE MINING ENGINEER

The graduate engineer will gain valuable experience in all disciplines of mine engineering and operation based on a pre-determined rotation program.
Assignment : Kideco & Tabang Project, East Kalimantan.

Requirements:

  1. Minimum Bachelor Degree (S1) in Mining Engineering, Geological Engineering, Civil Engineering, or Statistics with maximum graduated in 2018.
  2. Have a minimum GPA 3.00 out of 4.00 of grade scale.
  3. Self-motivated, good interpersonal, and communication skills
  4. Committed to learn and actively participated in the full program
  5. Proficient in English, written and verbal
  6. Willing to work in all Petrosea site location all over Indonesia

 

If you are interested in applying, please register at our online recruitment system and apply to position with title GRADUATE MINING ENGINEER, not later than 31 December 2020 on: PETROSEA CAREER (www.petrosea.com/career)

Please be aware of certain frauds or misinformation regarding recruitment advertising on behalf of Petrosea. We never ask for any payments whatsoever from applicants or candidates during the recruitment process. We never ask applicants or candidates to use specific travel agent services to make arrangements for transportation and accommodation during the recruitment process.

  • Di iklankan: 2020-12-23 22:07:47 - Standar Waktu Asia Tenggara
  • Berakhir: 2020-12-31 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00