Thursday, February 13, 2020 | 1467 reads | 0 comments | 0 shares
PT Petrosea Tbk. is a multi-disciplinary mining, infrastructure and oil & gas services Company with a track record of achievement in Indonesia since 1972. We offer a competitive advantage through our ability to provide complete pit-to-port mining solutions, integrated engineering and construction capabilities as well as logistic support, whilst demonstrating absolute commitment to health, safety & environment, quality management, and business integrity.
We also provide services for the oil and gas industry in Indonesia through our Petrosea Offshore Supply Base (POSB) deep-water supply base that consistently delivers international standard and cost-effective services to all of our clients. Petrosea has been listed on the Indonesia Stock Exchange (IDX: PTRO) since 1990 and was the first publicly listed Indonesian engineering and construction Company in Indonesia.
We are currently taking applicants for the following position:
(Assignment: Balikpapan Office)
Fabrication activities incl. plan, coordinate, Technical Documentation for steel structure material requirement and carry out technical evaluations including studies and calculation for steel structure for fabrication. Provide a safe, Reliable and Effective production in machining/Fabrication and Liaise with supervisor for and possible improvement/solutions. Provides manufacturing decision-making information by calculating production, labour, and material costs; reviewing production schedules; estimating future requirements And to ensure that all Fabrication Process can be effective and efficient on time according to time and budget.
Requirements:
Responsibilities:
(Assignment: Balikpapan Office)
To enable multivariate analysis of all machine health parameters and determine criticality of components based on available system within the company, and prioritize corrective maintenance actions & recommendations through to maintenance execution team in timely manner; as well as to gather feedbacks from maintenance execution team to improve corrective maintenance actions & recommendation going forward.
Requirements:
Responsibilities:
(Assignment – Balikpapan)
Provide a safe, reliable & effective production in machining / fabrication and liaise with Superintendent/Supervisor for any possible improvements / solutions. Conduct quality assessment to PTP and or approved specification standards
Requirements:
Responsibilities:
(Assignment – Balikpapan)
Provide a safe, reliable & effective production in machining / fabrication and liaise with Superintendent/Supervisor for any possible improvements / solutions. Conduct quality assessment to PTP and or approved specification standards
Requirements:
Responsibilities:
If you are interested into applying this position, please register yourself at our online recruitment system, Petrosea Career (http://career.petrosea.com) and apply to position with title, not later than 26 February 2020.
Please be aware of certain frauds or misinformation regarding recruitment advertising on behalf of Petrosea. We never ask for any payments whatsoever from applicants or candidates during the recruitment process. We never ask applicants or candidates to use specific travel agent services to make arrangements for transportation and accommodation during the recruitment process.
| Daerah | Sektor | Nominal (Rp.) |
| Kaltim | UMUM | 3,762,431,00 |
| Kaltim | Perkebunan Kelapa Sawit | 3,801,502,00 |
| Kaltim | Pertambangan Batubara | 3,930,722,00 |
| Kaltim | Pertambangan Gas Alam | 3,968,518,00 |
| Kaltim | Jasa Penunjang Migas | 3,968,518,00 |
| Kaltim | Industri Minyak Mentah Kelapa Sawit | 3,801,502,00 |
| Kaltim | Industri Kapal dan Perahu | 3,936,933,00 |
| Kaltim | Petambangan Minyak Bumi | 3,968,518,00 |
| Kaltim | Pemanen Kayu | 3,802,777,00 |
| Balikpapan | UMUM | 3,856,694.43 |
| Balikpapan | Industri Pemurnian dan Pengilangan Minyak Bumi | 4,024,614.91 |
| Balikpapan | Industri Komponen Dan Suku Cadang Mesin Dan Turbin | 3,999,700.66 |
| Berau | UMUM | 4,391,337.55 |
| Berau | Pertambangan Batu Bara | 4,463,705.35 |
| Berau | Perkebunan Buah Kelapa Sawit | 4,396,210.27 |
| Bontang | UMUM | 3,799,480,00 |
| Bontang | Kimia Dasar Anorganik Gas Industri | 4,017,950,00 |
| Bontang | Kimia Dasar Anorganik Lainnya | 4,017,950,00 |
| Bontang | Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian | 4,017,950,00 |
| Bontang | Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara | 4,017,950,00 |
| Bontang | Industri Pupuk Buatan Majemuk Hara Makro Primer | 4,017,950,00 |
| Bontang | Pertambangan Gas Alam | 4,975,637,00 |
| Bontang | Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam | 4,975,637,00 |
| Kubar | UMUM | 4,231,617.40 |
| Kukar | UMUM | 3,991,797,00 |
| Kukar | Perkebunan Buah Kelapa Sawit | 4,060,684,00 |
| Kukar | Pertambangan Batu Bara | 4,082,582,00 |
| Kukar | Pertambangan Gas Alam | 4,104,095,00 |
| Kukar | Jasa Penunjang Migas | 4,104,095,00 |
| Kukar | Industri Kapal dan Perahu | 4,039,170,00 |
| Kukar | Pertambangan Minyak Bumi | 4,104,095,00 |
| Kukar | Permanenan Kayu | 4,017,657,00 |
| Kukar | Industri Minyak Mentah Kelapa Sawit | 4,039,170,00 |
| Kutim | UMUM | 4,067,436,00 |
| Kutim | Perkebunan Buah Kelapa Sawit | 4,257,422,00 |
| Kutim | Pertambangan Batu Bara | 4,269,679,00 |
| Paser | UMUM | 3,776,998.06 |
| Paser | Perkebunan Buah Kelapa Sawit | 3,810,018.96 |
| PPU | UMUM | 4,181,134,00 |
| PPU | KEBUN SAWIT | 4,199,265,00 |
| PPU | INDUSTRI SAWIT | 4,199,265,00 |
| PPU | KEHUTANAN | 4,219,915,00 |
| PPU | BATUBARA | 4,302,696,00 |
| PPU | MIGAS | 4,344,068,00 |
| Samarinda | UMUM | 3,983,882,00 |
| Samarinda | Konstruksi Gedung | 4,043,640,00 |
| Samarinda | Konstruksi Instalasi Listrik | 4,043,640,00 |
| Samarinda | Angkutan Laut | 4,043,640,00 |
| Samarinda | Industri Kayu Lapis | 4,226,899,00 |