• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, January 22, 2020 | 731 reads | 0 comments | 0 shares

Foreman Maintenance & Planner - Kalimantan Selatan

PBMM has been rendering cargo stevedoring services at Taboneo since June 2013 and Kelanis since the 3rd quarter of 2017. In 2018, PBMM added 24 units of heavy equipment (loaders and dozers) to its fleet to reduce the use of third-party services in accommodating the Adaro Group’s stevedoring requirements. PBMM recorded higher stevedoring tonnages in 2018, which consisted of 35.5 Mt by gearless vessels, 6.4 Mt by geared vessels and 53.6 Mt for stevedoring at Kelanis, an increase from 33.2 Mt, 5.0 Mt and 16.6 Mt, respectively, in 2017.

The excellent growth of transshipment activities at Taboneo promises great market potentials to PBMM for pursuing new relationships with third parties, in addition to serving its sister companies within the Adaro Group.

 

Foreman Maintenance & Planner

Job Responsibilities

  • Responsible for the implementation of daily, weekly and monthly preventive and corrective maintenance
  • Allocate mechanic manpower in the implementation of maintenance work
  • Monitoring and identifying potential problems with transhipment heavy equipment & crane
  • Set availability and lifetime of equipment parts in Permata Barito Floating Office
  • Conduct routine inspections and help troubleshoot in special case

Job Requirements

  • Bachelor Degree Mechanical Engineering/  D3 Mechanical Engineering  (Heavy Equipment)
  • Min. 3 years experience as Foreman Mechanic Maintenance
  • Able to managing the system, maintenance planning and trouble shoot heavy equipment & Crane
  • Able to work by system and detail oriented
  • Willing to work placement in Taboneo

 

send your recent resume & photograph to recruitment.al@adaro.com with code Foreman Maintenance PBMM.

  • Di iklankan: 2020-01-22 20:25:35 - Standar Waktu Asia Tenggara
  • Berakhir: 2020-01-31 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00