• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Tuesday, April 25, 2017 | 1303 reads | 0 comments | 0 shares

JOB VACANCY BALIKPAPAN

JOB VACANCY

We are subsidiary of a large-scale national company located in BALIKPAPAN, east kalimantan  looking for people to join our team as:

 

  1. TECHNICAL MANAGER

  2. PRODUCTION MANAGER

  3. LEGAL SUPERVISOR

Requirements:

  1. Strong written and oral communication in English
  2. Extensive experience in handling projects
  3. Min. Bachelor’s Degree in Mechanical Engineering (1, 2) and Law (3)
  4. Min. 17 years (1, 2) and 10 years (3) working experience in the related field
  5. Knowledge and experience in production and manufacturing processes and techniques, quality systems and standards (2)
  6. Have solid experience in land acquisition, licenses (construction & operation), and have Indonesian legal knowledge and expertise (3)
  7. Preferably have "Surat Izin Beracara" (3)
  8. Applicants must be willing to work in Balikpapan

 

  1. OPERATOR WHEEL LOADER

Descriptions:

  1. Operate the Loader and other heavy equipment in a safe and appropriate manner.
  2. Perform daily maintenance and safety checks of equipment.
  3. Understand and follow directions from supervisors as to required work area
  4. Perform routine cleaning and maintenance to ensure smooth operation of the Loader
  5. Operate other heavy equipment and other construction related duties as required

Requirements:

  1. Candidate must possess Surat Izin Operator (SIO) Wheel Loader and Forklift
  2. Required language(s): English
  3. At least 12 Year(s) of working experience in the related field is required for this position.
  4. Required Skill(s): Wheel Loader, Forklift Applicants must be willing to work in Balikpapan

 

Interested candidates should submit their complete resume/cv with supporting documents (Copy of educational certificates, transcript,  copy of identity card) to recruitment@bmjperformanceboard.com before 30 April 2017.

  • Di iklankan: 2017-04-25 19:57:27 - Standar Waktu Asia Tenggara
  • Berakhir: 2017-04-30 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00