• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Monday, March 27, 2017 | 1748 reads | 0 comments | 0 shares

HSE STAFF

JOB VACANCY: HSE STAFF

Job Description:

  1. Develop and implement systems for managing health, safety & environment (HSE)
  2. Monitor and assess hazardous and unsafe situations and develop measures to assure personnel safety
  3. Report any adverse incidents in accordance with organisational guidelines
  4. Conversant with various kinds of safety equipment and encourage safe working practice
  5. "Assist in compliance reviews, general risk assessments and other safety assessments to support Health,
  6. Safety and Environmental management"
  7. Maintain relevant HSE logs and documentation
  8. Prepare applicable HSE reports as necessary

Requirements:

  1. Preferably Diploma in Nursing or Bachelor's Degree in Occupational Health and Safety
  2. Must have General Safety Expert (Ahli K3 Umum) Ceritificate
  3. Must have Basic First Aid & Basic Fire Fighting Certificate
  4. Min. 5 years working experience as HSE related position
  5. Min. 1 year experience in handling construction project
  6. Knowledge of Work Permit, Job Safety Analysis and HSE procedures
  7. Male, age 25-35 years old
  8. Willing to work in Balikpapan

 

Interested candidates should submit their complete resume/CV with supporting documents (copy of educational certificates, transcript, training certificates, copy of identity card) to recruitment@bmjperformanceboard.com before 5 April 2017.

Write the position applied for as the email subject line.

  • Di iklankan: 2017-03-27 14:06:08 - Standar Waktu Asia Tenggara
  • Berakhir: 2017-04-05 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00