• Kaltim 1
  • Kaltim 2
  • Kaltim 3
  • balikpapan 1
  • balikpapan 2
  • balikpapan 3
  • Berau 1
  • Bontang 1
  • Kubar 1
  • Kubar 2
  • Kukar 1
  • Kukar 2
  • Kutim 1
  • Mahulu 1
  • Mahulu 2
  • Paser 1
  • PPU 1
  • Samarinda 1
  • Samarinda 2
  • Kalimantan 1
  • Kalimantan 2
  • Kalimantan 3
  • Kalimantan 4
  • Kalimantan 5
  • Kalimantan 6
  • Kalimantan 7
  • Kalimantan 8

Wednesday, February 24, 2016 | 2480 reads | 0 comments | 0 shares

Vacancy PT. BORNEO ROTATING PRATAMA (INDOMINCO)

CAKRA GROUP

 Manufacturing, Repairing and Engineering Company

PT. BORNEO ROTATING PRATAMA is a Company engaged in the fabrication and repair of machines under CAKRA’s GROUP, require a reliable and professional personnel to fill the following positions are :

1.     Mechanical Support :

a)    Mobile Crusher system

I.                   Supervisor                 :           1  person

II.                Mechanic                   :           6  person

III.             Welder                       :           4  person

b)    Spreader system

I.                   Supervisor                 :           1  person

II.                Mechanic                   :           8  person

III.             Welder                       :           2  person

c)     Conveyor system

I.                   Supervisor                 :           1  person

II.                Mechanic                   :           8  person

III.             Welder                       :           2  person

2.     Electrical Support :

I.                   Supervisor                 :           3  person

II.                Electrician                 :           9  person

3.     Other Personel :

I.                   Site Manager             :           1  person

II.                Safety Officer             :           1  person

General requirement :

a.       Preferably engineering education with at least 3 years experience at each position;

b.      Physically and mentally healthy;

c.       Site Manager, Supervisor and other person that have responsibility must have basic knowledge of safety;

d.      Like challenges and is ready to work under pressure;

e.       Willing to be placed in the location (site Bontang).

 

Send  a cover letter, curriculum vitae, copies of the latest diploma along with transcripts, the most recent photograph (4x6), the letter notes the police statement, medical certificates and other supporting documents and specify the position code on the top of the envelope to:

HUMAN RESOURCE DEPARTMENT

PT. BORNEO ROTATING PRATAMA (CAKRA GROUP)

Jl. Proklamasi TPA Manggar Balikpapan

Email : ariez_pratama@brp.co.id

 ( Application received no later than the date of March 4, 2016 and only qualified applicants will be processed)

  • Di iklankan: 2016-02-24 17:52:01 - Standar Waktu Asia Tenggara
  • Berakhir: 2016-03-04 23:59:59 - Standar Waktu Asia Tenggara
allow_url_fopen is ON
BERLANGGANAN LOWONGAN KERJA
UPAH MINIMUM TAHUN 2026
Daerah Sektor Nominal (Rp.)
Kaltim UMUM 3,762,431,00
Kaltim Perkebunan Kelapa Sawit 3,801,502,00
Kaltim Pertambangan Batubara 3,930,722,00
Kaltim Pertambangan Gas Alam 3,968,518,00
Kaltim Jasa Penunjang Migas 3,968,518,00
Kaltim Industri Minyak Mentah Kelapa Sawit 3,801,502,00
Kaltim Industri Kapal dan Perahu 3,936,933,00
Kaltim Petambangan Minyak Bumi 3,968,518,00
Kaltim Pemanen Kayu 3,802,777,00
Balikpapan UMUM 3,856,694.43
Balikpapan Industri Pemurnian dan Pengilangan Minyak Bumi 4,024,614.91
Balikpapan Industri Komponen Dan Suku Cadang Mesin Dan Turbin 3,999,700.66
Berau UMUM 4,391,337.55
Berau Pertambangan Batu Bara 4,463,705.35
Berau Perkebunan Buah Kelapa Sawit 4,396,210.27
Bontang UMUM 3,799,480,00
Bontang Kimia Dasar Anorganik Gas Industri 4,017,950,00
Bontang Kimia Dasar Anorganik Lainnya 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber dari Hasil Pertanian 4,017,950,00
Bontang Industri Kimia Dasar Organik Yang Bersumber Dari Minyak Bumi,Gas Alam dan Batu Bara 4,017,950,00
Bontang Industri Pupuk Buatan Majemuk Hara Makro Primer 4,017,950,00
Bontang Pertambangan Gas Alam 4,975,637,00
Bontang Aktivitas Penunjang Pertambangan Minyak Bumi dan Gas Alam 4,975,637,00
Kubar UMUM 4,231,617.40
Kukar UMUM 3,991,797,00
Kukar Perkebunan Buah Kelapa Sawit 4,060,684,00
Kukar Pertambangan Batu Bara 4,082,582,00
Kukar Pertambangan Gas Alam 4,104,095,00
Kukar Jasa Penunjang Migas 4,104,095,00
Kukar Industri Kapal dan Perahu 4,039,170,00
Kukar Pertambangan Minyak Bumi 4,104,095,00
Kukar Permanenan Kayu 4,017,657,00
Kukar Industri Minyak Mentah Kelapa Sawit 4,039,170,00
Kutim UMUM 4,067,436,00
Kutim Perkebunan Buah Kelapa Sawit 4,257,422,00
Kutim Pertambangan Batu Bara 4,269,679,00
Paser UMUM 3,776,998.06
Paser Perkebunan Buah Kelapa Sawit 3,810,018.96
PPU UMUM 4,181,134,00
PPU KEBUN SAWIT 4,199,265,00
PPU INDUSTRI SAWIT 4,199,265,00
PPU KEHUTANAN 4,219,915,00
PPU BATUBARA 4,302,696,00
PPU MIGAS 4,344,068,00
Samarinda UMUM 3,983,882,00
Samarinda Konstruksi Gedung 4,043,640,00
Samarinda Konstruksi Instalasi Listrik 4,043,640,00
Samarinda Angkutan Laut 4,043,640,00
Samarinda Industri Kayu Lapis 4,226,899,00